Aluminium Facade Installation
When planning a 10-storey commercial development, one of the biggest questions clients ask Accend Aluminium and Glass is: “How long will the aluminium facade installation take?” Timing affects tenant occupation, contractor scheduling, and project budgeting, so accuracy matters. Below, we explain the key phases involved, the typical duration, what impacts the schedule, and how we minimise business disruption.
Understanding Aluminium Facade Installation
For commercial buildings, aluminium facade systems need precision. We use quality profiles, glazing, and thermal solutions to deliver a modern finish that performs well over time. Each floor requires specific handling, logistics, and safety measures, which influence the installation schedule.
Main keyword used: aluminium facade installation
Estimated Installation Time for a 10-Storey Building
For most 10-storey commercial projects, the full aluminium facade installation usually spans 14–24 weeks, depending on design complexity, material availability, and weather conditions. Planning upfront allows us to reduce delays and speed up delivery.
Project Phases Explained
1. Design Finalisation and Site Preparation (2–4 weeks)
We start with accurate shop drawings, measuring, and planning. Our team prepares the anchoring system, access scaffolding, and facade alignment plans. A clear start boosts efficiency for the remaining stages.
For facade design material and product quality, clients often browse:
-
2AS Curtain Wall Solutions: https://2ag.co.za/curtain-walling
-
Aluminium Shopfronts: https://2ag.co.za/aluminium-shopfronts
2. Material Fabrication (4–8 weeks)
Fabrication happens off-site, which allows other site work to continue. We use aluminium frames, glazing, and sealing systems. Fabrication overlaps with site prep, saving time.
Browse quality finishes here:
-
Profiles and Extrusions: https://2ag.co.za/aluminium-profiles
-
Custom Fabrication: https://2ag.co.za/custom-architectural
3. On-Site Installation (8–12 weeks)
Installation starts at the lower floors and progresses upward. Each floor usually completes within 5–8 days. Fast access systems, accurate erection, and quality checks keep the project on track.
For installation services:
-
Installation Support: https://2ag.co.za/glazing
-
Aluminium Windows: https://2ag.co.za/aluminium-windows
4. Sealing, Finishing & Quality Inspection (2–3 weeks)
The final stage includes sealing joints, water-resistance testing, and safety assessments.
See details:
-
Glass Processing: https://2ag.co.za/glass-processing
Key Factors That Affect Project Duration
Weather Conditions
High winds and heavy rain slow access lift operation. Dry days allow faster installation. Fortunately, planning during the drier season reduces weather-related delays.
Facade Complexity
A simple grid layout moves faster. A complex 3D or irregular design requires more time and precision.
Building Occupancy
If tenants already occupy lower floors, we schedule work around quiet periods, reducing disruption and noise.
Material Readiness
We finalise material orders early to avoid procurement delays.
How We Reduce Tenant Disruption
Accend Aluminium and Glass schedules installation outside peak business hours and uses quiet tools wherever possible. Our structured workflow ensures smooth progress without affecting building operations.
Global Resources for Better Understanding
We recommend clients review these helpful technical insights:
-
Aluminium Architectural Guidance (Global): https://www.aluminium.org
-
Facade Engineering Resource (International): https://www.facade-engineering.com
Conclusion: A Reliable Timeline You Can Plan Around
For a 10-storey building, a 14–24 week window provides an accurate and dependable timeline for aluminium facade installation. With detailed planning, quality materials, and expert execution, Accend Aluminium and Glass ensures safe, efficient, and durable installations in Roodepoort, Randburg, Johannesburg, and surrounding areas.
If you need detailed cost breakdowns or timeline planning support, our team is ready to assist.